Timber Frame Brick Clad

Step by step instruction on how to build your house in the best way.
Brick Cladding

1. Concrete Slab
2.Termite Homeguard Protection / sealed to slab
3. Timber Frame
4. OSB 3 or 4 Bracing – Taped Joins
5. 90mm Bulk infill
6. 300mm XPS Plinth Starter Block
7. Windows & Doors Reveals / Cill Details
8. Compriband Expanding Foam Seal to XPS and Windows and Doors
9. 60mm Rigid wood Fibre
10. Vapour Permeable Wrap & Taped Joins / Taped to Rebate
11. BAL compliant weep holes / air bricks. 2mm Stainless Mesh (Top & Bottom of Wall) for Ventilation.
12. Vertical Brick Clips for vented facade / Screw seal tape on back of Brick Tie / Fixed Back into Frame. Min 50mm Vented
13. Brick Cladding with min 50mm Airgap Behind

Inside Layers

14. OSB 3 or 4 Bracing & Airtightness (Intello as an Option)
15. Min 25mm Vertical Batten for service void
16. Gyproc or other internal finish
17. Lime based paints

1

Concrete Slab

2

Termite Homeguard Protection / sealed to slab

3

Timber Frame

4

OSB 3 or 4 Bracing - Taped Joins

5

90mm Bulk infill

6

300mm XPS Plinth Starter Block

7

Windows & Doors Reveals / Cill Details

8

Compriband Expanding Foam Seal to XPS and Windows and Doors and all butt joints

8

Compriband Expanding Foam Seal to XPS and Windows and Doors and all butt joints

9

60mm Rigid wood Fibre

10

Vapour Permeable Wrap & Taped Joins / Taped to Slab

11

BAL compliant weep holes / air bricks. 2mm Stainless Mesh
(Top & Bottom of Wall) for Ventilation.

11

BAL compliant weep holes / air bricks. 2mm Stainless Mesh
(Top & Bottom of Wall) for Ventilation.

12

Vertical Brick Clips for vented facade /
Screw seal tape on back of Brick Tie /
Fixed Back into Frame. Min 50mm Vented

13

Brick Cladding with min 50mm Airgap Behind

14

OSB 3 or 4 Bracing & Airtightness (Intello as an Option)

15

Min 25mm Vertical Batten for service void

16

Gyproc or other internal finish

17

Lime based paints